ITAC Assessment: UF0302
ITAC logo
ITAC Assessment: UF0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 205
Plant Area 170,100
ft2
Annual Production 46,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,926 15,651,556
kWh
Electricity Demand $161,077 50,362
kW-mo/yr
Natural Gas $184,752 23,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,265 $3,773 $3,818
84,853
kWh
$1,447
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,992 $550 $11,010
200,177
kWh
- - - $(-18.0) -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $21,535 $100,405 $9,365
208,113
kWh
$13,520
-
kW-mo/yr
- - $(-1,350.0) -
04 2.7135: Install occupancy sensors $8,740 $1,212 $8,740
158,905
kWh
- - - - -
05 2.2136: Install / repair insulation on steam lines $2,883 $2,330 - - $2,883
-
MMBtu
- - -
06 2.4133: Use most efficient type of electric motors $36,009 $132,451 $23,063
512,503
kWh
$12,946
-
kW-mo/yr
- - - -
07 2.4238: Do not use compressed air for personal cooling $4,587 - $4,587
83,407
kWh
- - - - -
08 3.5316: Contract a wood pallet recycling company $2,091 - - - - - - $2,091
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $20,631 $15,352 - - - $20,631
-
gal
- -
10 4.441: Install automatic packing equipment $111,281 $400,000 $(-240.0)
(-5,355)
kWh
$(-219.0)
-
kW-mo/yr
- - $111,740 -
TOTAL RECOMMENDED $224,014 $656,073 $60,343
1,242,603
kWh
$27,694
-
kW-mo/yr
$2,883
-
MMBtu
$20,631
-
gal
$110,372 $2,091
TOTAL IMPLEMENTED $23,727 $6,653 $19,415
368,437
kWh
$1,447
-
kW-mo/yr
$2,883
-
MMBtu
- $(-18.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings