Assessment Year | 2002 |
---|---|
Principal Product | Aluminum Extrusions |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 205 |
Plant Area |
170,100
ft2
|
Annual Production | 46,000,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $703,926 | 15,651,556 |
kWh
|
$0.045 |
Electricity Demand | $161,077 | 50,362 |
kW-mo/yr
|
$3.20 |
Natural Gas | $184,752 | 23,451 |
MMBtu
|
$7.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $224,014 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,727 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,265 | $3,773 |
$3,818
84,853
kWh
|
$1,447
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,992 | $550 |
$11,010
200,177
kWh
|
- | - | - | $(-18.0) | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $21,535 | $100,405 |
$9,365
208,113
kWh
|
$13,520
-
kW-mo/yr
|
- | - | $(-1,350.0) | - | |
04 | 2.7135: Install occupancy sensors | $8,740 | $1,212 |
$8,740
158,905
kWh
|
- | - | - | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $2,883 | $2,330 | - | - |
$2,883
-
MMBtu
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $36,009 | $132,451 |
$23,063
512,503
kWh
|
$12,946
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4238: Do not use compressed air for personal cooling | $4,587 | - |
$4,587
83,407
kWh
|
- | - | - | - | - | |
08 | 3.5316: Contract a wood pallet recycling company | $2,091 | - | - | - | - | - | - | $2,091 | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $20,631 | $15,352 | - | - | - |
$20,631
-
gal
|
- | - | |
10 | 4.441: Install automatic packing equipment | $111,281 | $400,000 |
$(-240.0)
(-5,355)
kWh
|
$(-219.0)
-
kW-mo/yr
|
- | - | $111,740 | - | |
TOTAL RECOMMENDED | $224,014 | $656,073 |
$60,343
1,242,603
kWh
|
$27,694
-
kW-mo/yr
|
$2,883
-
MMBtu
|
$20,631
-
gal
|
$110,372 | $2,091 | ||
TOTAL IMPLEMENTED | $23,727 | $6,653 |
$19,415
368,437
kWh
|
$1,447
-
kW-mo/yr
|
$2,883
-
MMBtu
|
- | $(-18.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs