Assessment Year | 2001 |
---|---|
Principal Product | Precision Ground Gears |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
49,000
ft2
|
Annual Production | 35,000
pieces
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,630 | 1,334,640 |
kWh
|
$0.045 |
Electricity Demand | $25,556 | 3,392 |
kW-mo/yr
|
$7.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,501 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,664 | $805 |
$1,664
36,541
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,182 | $410 |
$1,254
19,589
kWh
|
- | $(-72.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,194 | - |
$1,194
18,656
kWh
|
- | - | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $16,196 | $19,500 |
$16,196
253,067
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,470 | $8,362 |
$6,423
142,736
kWh
|
$2,047
-
kW-mo/yr
|
- | - | |
06 | 2.7131: Add area lighting switches | $648 | $232 |
$648
14,390
kWh
|
- | - | - | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $5,353 | $15,176 |
$3,063
68,063
kWh
|
$2,485
-
kW-mo/yr
|
$(-195.0) | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $12,201 | $30,000 |
$9,481
210,700
kWh
|
$2,720
-
kW-mo/yr
|
- | - | |
09 | 3.7193: Use high pressure wash systems | $41,558 | $175,800 | - | - | - | $41,558 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,165 | $5,237 |
$1,220
(-27,115)
kWh
|
$(-524.0)
-
kW-mo/yr
|
- | $4,469 | |
TOTAL RECOMMENDED | $93,631 | $255,522 |
$41,143
736,627
kWh
|
$6,728
-
kW-mo/yr
|
$(-267.0) | $46,027 | ||
TOTAL IMPLEMENTED | $22,501 | $39,004 |
$17,806
387,415
kWh
|
$4,767
-
kW-mo/yr
|
$(-72.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs