ITAC Assessment: UF0280
ITAC logo
ITAC Assessment: UF0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Truck Accessories
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 185,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,083 1,263,760
kWh
Electricity Demand $20,493 4,494
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $182,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,913

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,550 $410 $1,604
30,258
kWh
- - $(-54.0) - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,615 $7,198 $6,815
189,304
kWh
$1,800
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $15,000 $50 - - - $15,000 - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $11,751 $25,263 $12,001
226,440
kWh
- - $(-250.0) - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,972 $20,010 $3,774
104,825
kWh
$2,358
-
kW-mo/yr
- - $3,840 -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,427 $8,000 - - $2,427
-
lb
- - -
07 3.5311: Recover and reuse waste material $1,867 $534 - - $1,867
-
lb
- - -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $117,000 $120,250 - - - - - $117,000
09 4.448: Install automatic part storage / retreval system $14,321 $4,612 - - - $14,321 - -
TOTAL RECOMMENDED $182,503 $186,327 $24,194
550,827
kWh
$4,158
-
kW-mo/yr
$4,294
-
lb
$29,017 $3,840 $117,000
TOTAL IMPLEMENTED $41,913 $20,270 $8,419
219,562
kWh
$1,800
-
kW-mo/yr
$2,427
-
lb
$29,267 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs