ITAC Assessment: UF0279
ITAC logo
ITAC Assessment: UF0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Medical Filtering and Separating Membranes
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 600,000
ft2
Annual Production 9,200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,847 7,658,400
kWh
Electricity Demand $139,245 16,248
kW-mo/yr
Natural Gas $295,240 34,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $9,057 $10,208 $5,560
222,382
kWh
$3,497
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $696 $660 $413
16,500
kWh
$283
-
kW-mo/yr
- - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $20,871 $62,226 $20,871
474,351
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,241 $1,520 $569
22,776
kWh
$267
-
kW-mo/yr
$380 $1,025 -
05 2.7124: Make a practice of turning off lights when not needed $2,260 - $1,341
53,640
kWh
$919
-
kW-mo/yr
- - -
06 2.7145: Install skylights $2,897 $3,188 $1,035
41,399
kWh
$1,892
-
kW-mo/yr
$(-30.0) - -
07 2.7135: Install occupancy sensors $2,853 $767 $2,853
64,848
kWh
- - - -
08 3.5316: Contract a wood pallet recycling company $1,800 - - - $1,800 - -
09 4.448: Install automatic part storage / retreval system $6,500 $4,612 - - - - $6,500
TOTAL RECOMMENDED $49,175 $83,181 $32,642
895,896
kWh
$6,858
-
kW-mo/yr
$2,150 $1,025 $6,500
TOTAL IMPLEMENTED $24,711 $17,107 $10,323
363,646
kWh
$4,683
-
kW-mo/yr
$2,180 $1,025 $6,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs