| Assessment Year | 2001 |
|---|---|
| Principal Product | Dimensioned Lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
100,000
ft2
|
| Annual Production | 90,000,000
units
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $648,593 | 9,531,396 |
kWh
|
$0.068 |
| Electricity Demand | $210,773 | 24,132 |
kW-mo/yr
|
$8.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,956,042 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $191,963 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,583 | $470 |
$7,637
84,858
kWh
|
- | - | $(-54.0) | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,473 | $1,218 |
$1,181
17,372
kWh
|
$292
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $989 | - |
$989
14,550
kWh
|
- | - | - | - | |
| 04 | 2.6125: Keep equipment clean | $30,658 | $15,840 |
$11,787
173,333
kWh
|
$3,373
-
kW-mo/yr
|
- | $15,498 | - | |
| 05 | 2.7134: Use photocell controls | $2,476 | $300 |
$1,518
22,321
kWh
|
$1,058
-
kW-mo/yr
|
- | $(-100.0) | - | |
| 06 | 2.3212: Optimize plant power factor | $16,800 | $27,000 | - | - | - | $16,800 | - | |
| 07 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $1,214,675 | $4,500,000 |
$707,200
10,400,000
kWh
|
$209,520
-
kW-mo/yr
|
$(-922,604.0)
-
MMBtu
|
$1,220,559 | - | |
| 08 | 2.2314: Replace heat treating oven with more efficient unit | $447,000 | $990,000 | - | - | - | $447,000 | - | |
| 09 | 3.1182: Make a new by-product | $1,686,712 | $272,000 |
$(-15,756.0)
231,712
kWh
|
$(-11,671.0)
-
kW-mo/yr
|
- | $1,714,139 | - | |
| 10 | 4.611: Begin a practice of predictive / preventative maintenance | $15,600 | $1,200 | - | - | - | $15,600 | - | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,333 | - |
$10,824
159,183
kWh
|
- | - | $578 | $931 | |
| 12 | 4.424: Improve space comfort conditioning | $411,743 | $9,000 | - | - | - | $411,743 | - | |
| 13 | 4.111: Add equipment/ operators to reduce production bottleneck | $108,000 | $900,000 | - | - | - | $108,000 | - | |
| TOTAL RECOMMENDED | $3,956,042 | $6,717,028 |
$725,380
11,103,329
kWh
|
$202,572
-
kW-mo/yr
|
$(-922,604.0)
-
MMBtu
|
$3,949,763 | $931 | ||
| TOTAL IMPLEMENTED | $191,963 | $944,510 |
$31,237
431,924
kWh
|
$3,373
-
kW-mo/yr
|
- | $156,422 | $931 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs