ITAC Assessment: UF0273
ITAC logo
ITAC Assessment: UF0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Small Aircrafts
NAICS
n/a
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,122,766 19,443,600
kWh
Electricity Demand $176,193 48,958
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $201,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.8121: Apply for tax-free status for energy purchases $48,885 $50 - - - $48,885 - -
02 4.652: Replace existing equipment with more suitable substitutes $916 $525 $264
4,555
kWh
$22
-
kW-mo/yr
- $225 $405 -
03 2.7135: Install occupancy sensors $381 $414 $381
6,562
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $1,421 $5,130 $1,118
19,284
kWh
$303
-
kW-mo/yr
- - - -
05 2.6218: Turn off equipment when not in use $624 - $624
10,763
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,486 $9,838 $29,486
387,984
kWh
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $9,118 $436 $9,118
119,973
kWh
- - - - -
08 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $42,120 $35,000 - - $42,120
-
Tgal
- - -
09 2.4238: Do not use compressed air for personal cooling $8,415 $2,324 $3,415
51,264
kWh
- - $5,000 - -
10 4.111: Add equipment/ operators to reduce production bottleneck $59,693 $4,000 $(-4,307.0)
(-74,250)
kWh
- - - - $64,000
TOTAL RECOMMENDED $201,059 $57,717 $40,099
526,135
kWh
$325
-
kW-mo/yr
$42,120
-
Tgal
$54,110 $405 $64,000
TOTAL IMPLEMENTED $61,614 $4,939 $(-3,038.0)
(-52,370)
kWh
$22
-
kW-mo/yr
- $225 $405 $64,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs