Assessment Year | 2001 |
---|---|
Principal Product | Small Aircrafts |
NAICS |
n/a
|
SIC | 3721: Aircraft |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
200,000
ft2
|
Annual Production | 450
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,122,766 | 19,443,600 |
kWh
|
$0.058 |
Electricity Demand | $176,193 | 48,958 |
kW-mo/yr
|
$3.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $201,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,614 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $48,885 | $50 | - | - | - | $48,885 | - | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $916 | $525 |
$264
4,555
kWh
|
$22
-
kW-mo/yr
|
- | $225 | $405 | - | |
03 | 2.7135: Install occupancy sensors | $381 | $414 |
$381
6,562
kWh
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,421 | $5,130 |
$1,118
19,284
kWh
|
$303
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $624 | - |
$624
10,763
kWh
|
- | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,486 | $9,838 |
$29,486
387,984
kWh
|
- | - | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,118 | $436 |
$9,118
119,973
kWh
|
- | - | - | - | - | |
08 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $42,120 | $35,000 | - | - |
$42,120
-
Tgal
|
- | - | - | |
09 | 2.4238: Do not use compressed air for personal cooling | $8,415 | $2,324 |
$3,415
51,264
kWh
|
- | - | $5,000 | - | - | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $59,693 | $4,000 |
$(-4,307.0)
(-74,250)
kWh
|
- | - | - | - | $64,000 | |
TOTAL RECOMMENDED | $201,059 | $57,717 |
$40,099
526,135
kWh
|
$325
-
kW-mo/yr
|
$42,120
-
Tgal
|
$54,110 | $405 | $64,000 | ||
TOTAL IMPLEMENTED | $61,614 | $4,939 |
$(-3,038.0)
(-52,370)
kWh
|
$22
-
kW-mo/yr
|
- | $225 | $405 | $64,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs