ITAC Assessment: UF0272
ITAC logo
ITAC Assessment: UF0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Mobile Phones
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 60,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,523 2,352,872
kWh
Electricity Demand $47,141 4,832
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,855 $5,330 $16,258
353,458
kWh
$4,597
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,175 $525 $278
6,155
kWh
$57
-
kW-mo/yr
$840
03 2.6218: Turn off equipment when not in use $9,845 $42,000 $9,845
215,416
kWh
- -
04 2.6125: Keep equipment clean $9,330 $12,500 $5,465
118,699
kWh
$3,865
-
kW-mo/yr
-
05 2.7134: Use photocell controls $9,635 $50 - - $9,635
06 2.3212: Optimize plant power factor $1,179 $416 $1,179
25,498
kWh
- -
07 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $416 $1,895 - - $416
08 2.2314: Replace heat treating oven with more efficient unit $614 $1,500 - - $614
09 3.1182: Make a new by-product $20,000 $32,250 - - $20,000
TOTAL RECOMMENDED $73,049 $96,466 $33,025
719,226
kWh
$8,519
-
kW-mo/yr
$31,505
TOTAL IMPLEMENTED $30,490 $5,380 $16,258
353,458
kWh
$4,597
-
kW-mo/yr
$9,635
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs