ITAC Assessment: UF0266
ITAC logo
ITAC Assessment: UF0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Mobile homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 127,000
ft2
Annual Production 500
units
Production Hrs. Annual 2,313
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,794 993,259
kWh
Electricity Demand $29,470 4,245
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $5,100 $50 - - - $5,100
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,082 $5,941 $5,347
95,545
kWh
$2,735
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,081 $410 $1,123
13,189
kWh
- - $(-42.0)
04 2.7124: Make a practice of turning off lights when not needed $1,037 - - - - $1,037
05 2.7145: Install skylights $21,467 $60,291 $12,656
225,967
kWh
$9,411
-
kW-mo/yr
- $(-600.0)
06 2.6242: Minimize operation of equipment maintained in standby condition $5,591 - - $5,591
-
kW-mo/yr
- -
07 3.5316: Contract a wood pallet recycling company $800 - - - - $800
08 3.5311: Recover and reuse waste material $5,400 - - - - $5,400
09 4.444: Install system to collect scrap $14,581 $4,926 - - $(-419.0)
-
MMBtu
$15,000
TOTAL RECOMMENDED $63,139 $71,618 $19,126
334,701
kWh
$17,737
-
kW-mo/yr
$(-419.0)
-
MMBtu
$26,695
TOTAL IMPLEMENTED $13,418 $460 $1,123
13,189
kWh
- - $12,295
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings