ITAC Assessment: UF0265
ITAC logo
ITAC Assessment: UF0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Mobile home cabinet doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 20,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,696 1,033,118
kWh
Electricity Demand $38,661 6,495
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4238: Do not use compressed air for personal cooling $367 $1,196 $733
7,913
kWh
$(-366.0)
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $3,497 $50 - - - $3,497
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,183 $1,251 $932
16,413
kWh
$251
-
kW-mo/yr
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $351 - $275
4,689
kWh
$139
-
kW-mo/yr
- $(-63.0)
05 2.7135: Install occupancy sensors $213 $311 $213
3,810
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $544 - $544
5,862
kWh
- - -
07 2.6218: Turn off equipment when not in use $2,000 - $2,000
35,170
kWh
- - -
08 2.4133: Use most efficient type of electric motors $1,638 $6,928 $1,267
19,050
kWh
$371
-
kW-mo/yr
- -
09 3.1291: Eliminate practice of mixing waste streams $173 - - - $173
-
lb
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,880 $8,000 - - $2,880
-
lb
-
11 3.5217: Reuse / recycle/ sell paper products $281 - - - $281
-
lb
-
12 4.652: Replace existing equipment with more suitable substitutes $9,648 - - - - $9,648
TOTAL RECOMMENDED $22,775 $17,736 $5,964
92,907
kWh
$395
-
kW-mo/yr
$3,334
-
lb
$13,082
TOTAL IMPLEMENTED $18,684 $9,425 $5,207
83,235
kWh
$395
-
kW-mo/yr
- $13,082
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs