ITAC Assessment: UF0263
ITAC logo
ITAC Assessment: UF0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Residential Lighting Fixtures
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 325,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,404 2,185,522
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $175,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $10,876 $50 - $10,876
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,224 $22,105 $10,224
152,696
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,927 $22,821 $4,927
76,788
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,095 $1,800 $2,095
11,430
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $977 - $977
14,654
kWh
-
06 3.5316: Contract a wood pallet recycling company $12,420 - - $12,420
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $800 $1,895 - $800
08 4.111: Add equipment/ operators to reduce production bottleneck $125,126 $20,000 $(-24,874.0)
(-371,336)
kWh
$150,000
09 4.111: Add equipment/ operators to reduce production bottleneck $7,800 $4,612 - $7,800
TOTAL RECOMMENDED $175,245 $73,283 $(-6,651.0)
(-115,768)
kWh
$181,896
TOTAL IMPLEMENTED $44,392 $28,567 $13,296
178,780
kWh
$31,096
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs