Assessment Year | 2000 |
---|---|
Principal Product | Residential Lighting Fixtures |
NAICS |
n/a
|
SIC | 3645: Residential Electric Lighting Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
325,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 2,750
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,404 | 2,185,522 |
kWh
|
$0.067 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $175,245 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $10,876 | $50 | - | $10,876 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,224 | $22,105 |
$10,224
152,696
kWh
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,927 | $22,821 |
$4,927
76,788
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,095 | $1,800 |
$2,095
11,430
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $977 | - |
$977
14,654
kWh
|
- | |
06 | 3.5316: Contract a wood pallet recycling company | $12,420 | - | - | $12,420 | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $800 | $1,895 | - | $800 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $125,126 | $20,000 |
$(-24,874.0)
(-371,336)
kWh
|
$150,000 | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $7,800 | $4,612 | - | $7,800 | |
TOTAL RECOMMENDED | $175,245 | $73,283 |
$(-6,651.0)
(-115,768)
kWh
|
$181,896 | ||
TOTAL IMPLEMENTED | $44,392 | $28,567 |
$13,296
178,780
kWh
|
$31,096 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs