ITAC Assessment: UF0262
ITAC logo
ITAC Assessment: UF0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Foam Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 120,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,403 3,325,616
kWh
Electricity Demand $88,358 9,223
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,084 $2,894 $3,582
85,287
kWh
$1,502
-
kW-mo/yr
-
02 2.8121: Apply for tax-free status for energy purchases $10,589 $50 - - $10,589
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,167 $840 $217
5,275
kWh
$68
-
kW-mo/yr
$882
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,364 $470 $1,418
20,809
kWh
- $(-54.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,026 - $2,026
29,894
kWh
- -
06 2.7141: Lower light fixtures in high ceiling areas $7,811 $28,082 $8,086
192,556
kWh
- $(-275.0)
07 2.4238: Do not use compressed air for personal cooling $1,365 $1,212 $1,365
20,223
kWh
- -
08 2.4133: Use most efficient type of electric motors $19,701 $12,130 $14,341
199,004
kWh
$5,360
-
kW-mo/yr
-
09 3.4155: Meter waste water $1,570 $1,500 - - $1,570
10 3.5212: Regrind, reuse, or sell scrap plastic parts $9,324 - - - $9,324
11 4.125: $15,600 $1,100 - - $15,600
TOTAL RECOMMENDED $75,601 $48,278 $31,035
553,048
kWh
$6,930
-
kW-mo/yr
$37,636
TOTAL IMPLEMENTED $42,866 $19,096 $22,949
360,492
kWh
$6,930
-
kW-mo/yr
$12,987
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs