ITAC Assessment: UF0255
ITAC logo
ITAC Assessment: UF0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal Castings
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 73,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,245 1,585,287
kWh
Natural Gas $15,912 1,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $226,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,688 $862 $1,688
18,757
kWh
- - -
02 2.8112: Combine utility meters $40,200 $4,100 - - - $40,200
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,206 $871 $2,206
24,326
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $349 - $349
3,810
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $962 $220 $962
10,844
kWh
- - -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $511 - - - $511
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,500 $8,000 - - $2,500
-
lb
-
08 4.114: Add/modify equipment to improve drying process $178,412 $250,000 - $178,412
-
MMBtu
- -
TOTAL RECOMMENDED $226,828 $264,053 $5,205
57,737
kWh
$178,412
-
MMBtu
$3,011
-
lb
$40,200
TOTAL IMPLEMENTED $226,828 $264,053 $5,205
57,737
kWh
$178,412
-
MMBtu
$3,011
-
lb
$40,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs