| Assessment Year | 2000 |
|---|---|
| Principal Product | Metal Castings |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
73,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $143,245 | 1,585,287 |
kWh
|
$0.090 |
| Natural Gas | $15,912 | 1,961 |
MMBtu
|
$8.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $226,828 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $226,828 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,688 | $862 |
$1,688
18,757
kWh
|
- | - | - | |
| 02 | 2.8112: Combine utility meters | $40,200 | $4,100 | - | - | - | $40,200 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,206 | $871 |
$2,206
24,326
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $349 | - |
$349
3,810
kWh
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $962 | $220 |
$962
10,844
kWh
|
- | - | - | |
| 06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $511 | - | - | - |
$511
-
lb
|
- | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,500 | $8,000 | - | - |
$2,500
-
lb
|
- | |
| 08 | 4.114: Add/modify equipment to improve drying process | $178,412 | $250,000 | - |
$178,412
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $226,828 | $264,053 |
$5,205
57,737
kWh
|
$178,412
-
MMBtu
|
$3,011
-
lb
|
$40,200 | ||
| TOTAL IMPLEMENTED | $226,828 | $264,053 |
$5,205
57,737
kWh
|
$178,412
-
MMBtu
|
$3,011
-
lb
|
$40,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs