ITAC Assessment: UF0251
ITAC logo
ITAC Assessment: UF0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Meat Products
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 5,200,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,253 1,678,195
kWh
Electricity Demand $38,448 2,130
kW-mo/yr
Natural Gas $65,035 8,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2135: Repair and eliminate steam leaks $786 $440 - - $786
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $228 $228 $125
2,931
kWh
$103
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $6,447 $50 - - - - $6,447
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $863 $220 $863
13,189
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $616 - $616
9,379
kWh
- - - -
06 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $44,000 $3,034 - - - $44,000
-
lb
-
07 3.5315: Lease / purchase baler; sell cardboard to recycler $940 - - - - $940
-
lb
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $378 - $378
8,499
kWh
- - - -
09 4.652: Replace existing equipment with more suitable substitutes $418 $280 $47
1,172
kWh
$15
-
kW-mo/yr
- - $356
10 4.441: Install automatic packing equipment $104,000 $110,000 - - - - $104,000
TOTAL RECOMMENDED $158,676 $114,252 $2,029
35,170
kWh
$118
-
kW-mo/yr
$786
-
MMBtu
$44,940
-
lb
$110,803
TOTAL IMPLEMENTED $53,736 $4,252 $2,029
35,170
kWh
$118
-
kW-mo/yr
$786
-
MMBtu
$44,000
-
lb
$6,803
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs