ITAC Assessment: SF0094
ITAC logo
ITAC Assessment: SF0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Injection Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 13,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 2,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,326 483,587
kWh
Electricity Demand $8,985 2,160
kW-mo/yr
Natural Gas $851 100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $183 $653 $146
1,758
kWh
$37
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,146 $12,480 $2,556
28,429
kWh
$590
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,762 $1,975 $2,016
22,567
kWh
$562
-
kW-mo/yr
$(-816.0)
-
MMBtu
- -
04 2.2511: Insulate bare equipment $4,296 $8,880 $4,296
48,066
kWh
- - - -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $10,370 $500 - - - $3,265
-
lb
$7,105
TOTAL RECOMMENDED $19,757 $24,488 $9,014
100,820
kWh
$1,189
-
kW-mo/yr
$(-816.0)
-
MMBtu
$3,265
-
lb
$7,105
TOTAL IMPLEMENTED $3,329 $13,133 $2,702
30,187
kWh
$627
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs