ITAC Assessment: LS2115
ITAC logo
ITAC Assessment: LS2115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range less than $500
k
# of Employees 6
Plant Area 42,635
ft2
Annual Production 1
units
Production Hrs. Annual 4,004
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,935 1,663,200
kWh
Electricity Demand $42,373 14,428
kW-mo/yr
TOTAL YEARLY COSTS $206,308
RECOMMENDED SAVINGS* $8,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,865 $270 $2,865
28,943
kWh
-
02 2.7261: Install timers and/or thermostats $527 $75 $527
5,326
kWh
-
03 2.7135: Install occupancy sensors $295 $50 $295
2,978
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,387 $789 $2,287
23,097
kWh
$100
-
kW-mo/yr
05 2.7124: Make a practice of turning off lights when not needed $844 $300 $844
8,526
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,076 $451 $1,076
10,866
kWh
-
07 2.7134: Use photocell controls $152 $147 $152
1,533
kWh
-
TOTAL RECOMMENDED $8,146 $2,082 $8,046
81,269
kWh
$100
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs