ITAC Assessment: UF0249
ITAC logo
ITAC Assessment: UF0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Car Batteries
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 195,000
ft2
Annual Production 2,900,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,305,153 26,901,231
kWh
Electricity Demand $85,055 52,884
kW-mo/yr
Electricity Fees $449,439 -
Natural Gas $146,707 53,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,294,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,257

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,575 $6,093 $6,008
122,509
kWh
$567
-
kW-mo/yr
- - - -
02 2.8121: Apply for tax-free status for energy purchases $31,004 $50 - - - - - $31,004
03 2.2437: Recover waste heat from equipment $16,950 $25,000 - - - $16,950
-
MMBtu
- -
04 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,684,933 $2,200,000 $1,287,720
26,279,895
kWh
$57,960
-
kW-mo/yr
- $285,253
-
MMBtu
- $54,000
05 2.4133: Use most efficient type of electric motors $1,678 $4,886 $1,603
32,825
kWh
$75
-
kW-mo/yr
- - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $93,870 $9,000 - - - - $93,870
-
lb
-
07 3.5218: Reuse / recycle/ sell rubber products $2,400 - - - - - $2,400
-
lb
-
08 2.3212: Optimize plant power factor $7,881 $9,000 - - - - - $7,881
09 4.651: Install back-up equipment $449,439 $2,100,000 - - $449,439 - - -
TOTAL RECOMMENDED $2,294,730 $4,354,029 $1,295,331
26,435,229
kWh
$58,602
-
kW-mo/yr
$449,439 $302,203
-
MMBtu
$96,270
-
lb
$92,885
TOTAL IMPLEMENTED $39,257 $11,029 $7,611
155,334
kWh
$642
-
kW-mo/yr
- - - $31,004
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs