| Assessment Year | 2000 |
|---|---|
| Principal Product | Car Batteries |
| NAICS |
n/a
|
| SIC | 3691: Storage Batteries |
| Sales Range | $50 M to 100M |
| # of Employees | 220 |
| Plant Area |
195,000
ft2
|
| Annual Production | 2,900,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,305,153 | 26,901,231 |
kWh
|
$0.049 |
| Electricity Demand | $85,055 | 52,884 |
kW-mo/yr
|
$1.61 |
| Electricity Fees | $449,439 | - |
|
- |
| Natural Gas | $146,707 | 53,550 |
MMBtu
|
$2.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $2,294,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,257 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,575 | $6,093 |
$6,008
122,509
kWh
|
$567
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $31,004 | $50 | - | - | - | - | - | $31,004 | |
| 03 | 2.2437: Recover waste heat from equipment | $16,950 | $25,000 | - | - | - |
$16,950
-
MMBtu
|
- | - | |
| 04 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,684,933 | $2,200,000 |
$1,287,720
26,279,895
kWh
|
$57,960
-
kW-mo/yr
|
- |
$285,253
-
MMBtu
|
- | $54,000 | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,678 | $4,886 |
$1,603
32,825
kWh
|
$75
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $93,870 | $9,000 | - | - | - | - |
$93,870
-
lb
|
- | |
| 07 | 3.5218: Reuse / recycle/ sell rubber products | $2,400 | - | - | - | - | - |
$2,400
-
lb
|
- | |
| 08 | 2.3212: Optimize plant power factor | $7,881 | $9,000 | - | - | - | - | - | $7,881 | |
| 09 | 4.651: Install back-up equipment | $449,439 | $2,100,000 | - | - | $449,439 | - | - | - | |
| TOTAL RECOMMENDED | $2,294,730 | $4,354,029 |
$1,295,331
26,435,229
kWh
|
$58,602
-
kW-mo/yr
|
$449,439 |
$302,203
-
MMBtu
|
$96,270
-
lb
|
$92,885 | ||
| TOTAL IMPLEMENTED | $39,257 | $11,029 |
$7,611
155,334
kWh
|
$642
-
kW-mo/yr
|
- | - | - | $31,004 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs