Assessment Year | 2000 |
---|---|
Principal Product | Air Conditioning and Refrigeration Parts |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 255 |
Plant Area |
115,000
ft2
|
Annual Production | 14,000,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,882 | 2,024,912 |
kWh
|
$0.049 |
Electricity Demand | $55,857 | 6,323 |
kW-mo/yr
|
$8.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $205,144 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,502 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $296 | $720 |
$177
2,931
kWh
|
$35
-
kW-mo/yr
|
- | - | $84 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,439 | - |
$1,439
18,757
kWh
|
- | - | - | - | |
03 | 4.812: Apply for investment incentives | $19,584 | $50 | - | - | - | - | $19,584 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $384 | $700 |
$884
18,171
kWh
|
- | - | - | $(-500.0) | |
05 | 2.7145: Install skylights | $12,479 | $59,793 |
$12,479
254,689
kWh
|
- | - | - | - | |
06 | 4.821: Pay bills on time to avoid late fees | $822 | - | - | - | - | - | $822 | |
07 | 3.4155: Meter waste water | $4,196 | $6,000 | - | - |
$4,196
-
Tgal
|
- | - | |
08 | 4.441: Install automatic packing equipment | $20,800 | $14,250 | - | - | - | $20,800 | - | |
09 | 4.441: Install automatic packing equipment | $145,144 | $250,000 | - | - | - | - | $145,144 | |
TOTAL RECOMMENDED | $205,144 | $331,513 |
$14,979
294,548
kWh
|
$35
-
kW-mo/yr
|
$4,196
-
Tgal
|
$20,800 | $165,134 | ||
TOTAL IMPLEMENTED | $1,502 | $1,420 |
$1,061
21,102
kWh
|
$35
-
kW-mo/yr
|
- | - | $406 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs