ITAC Assessment: UF0246
ITAC logo
ITAC Assessment: UF0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Newspaper Publishing and Offset Printing
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range n/a
# of Employees 1,950
Plant Area 826,000
ft2
Annual Production 133,952,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,060,017 30,941,384
kWh
Electricity Demand $614,120 59,483
kW-mo/yr
Natural Gas $27,491 4,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $462,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,359 $14,443 $4,836
142,145
kWh
$1,523
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,169 $1,075 $3,169
93,200
kWh
- - - - -
03 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $391,026 $1,500,000 $845,257
24,859,907
kWh
$461,676
-
kW-mo/yr
$(-730,147.0)
-
MMBtu
- $(-185,760.0) -
04 2.2221: Use immersion heating in tanks, melting pots, etc $584 $20 - - - $584
-
MMBtu
- -
05 2.8121: Apply for tax-free status for energy purchases $49,313 $50 - - - - - $49,313
06 4.652: Replace existing equipment with more suitable substitutes $1,959 $3,000 $589
17,292
kWh
$245
-
kW-mo/yr
- - $1,125 -
07 4.111: Add equipment/ operators to reduce production bottleneck $9,961 $6,400 $(-74.0)
(-2,052)
kWh
$(-185.0)
-
kW-mo/yr
- - $10,220 -
TOTAL RECOMMENDED $462,371 $1,524,988 $853,777
25,110,492
kWh
$463,259
-
kW-mo/yr
$(-730,147.0)
-
MMBtu
$584
-
MMBtu
$(-174,415.0) $49,313
TOTAL IMPLEMENTED $70,761 $24,968 $8,520
250,585
kWh
$1,583
-
kW-mo/yr
- - $11,345 $49,313
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs