ITAC Assessment: UF0245
ITAC logo
ITAC Assessment: UF0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fiberglass boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 80,000
ft2
Annual Production 520
pieces
Production Hrs. Annual 4,208
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,665 2,114,889
kWh
Electricity Demand $17,009 2,130
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $301,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $3,623 $50 n/a - - $3,623
02 2.7142: Utilize higher efficiency lamps and/or ballasts $203 $360 n/a $100
4,982
kWh
$16
-
kW-mo/yr
$87
03 2.6218: Turn off equipment when not in use $4,849 - n/a $3,284
160,023
kWh
$1,565
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $532 - n/a $460
22,274
kWh
$72
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $221 n/a $1,345
47,479
kWh
- -
06 3.4155: Meter waste water $2,499 $2,000 n/a - - $2,499
07 3.5316: Contract a wood pallet recycling company $470 - n/a - - $470
08 4.111: Add equipment/ operators to reduce production bottleneck $265,485 - n/a - - $265,485
09 4.431: Train operators for maximum operating efficiency $2,080 $420 n/a - - $2,080
10 4.423: Move product using mechanical means $18,992 $10,000 n/a - - $18,992
11 4.821: Pay bills on time to avoid late fees $1,040 - n/a - - $1,040
TOTAL RECOMMENDED $301,118 $13,051 $5,189
234,758
kWh
$1,653
-
kW-mo/yr
$294,276
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs