ITAC Assessment: UF0238
ITAC logo
ITAC Assessment: UF0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Chocolate Candies
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range n/a
# of Employees 77
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,756 3,599,062
kWh
Electricity Demand $75,336 9,527
kW-mo/yr
LPG $3,063 384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,479 $7,893 $1,511
35,170
kWh
$968
-
kW-mo/yr
- - -
02 2.2515: Use optimum thickness insulation $1,894 $1,361 $1,894
43,962
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,287 - $1,103
8,792
kWh
$184
-
kW-mo/yr
- - -
04 2.2223: Enhance sensitivity of temperature control and cutoff $584 $20 - - $584
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,670 - $3,670
58,324
kWh
- - - -
06 2.4239: Eliminate or reduce compressed air usage $6,767 $1,605 - $(-223.0)
-
kW-mo/yr
- - $6,990
07 4.652: Replace existing equipment with more suitable substitutes $1,699 $2,720 $917
7,913
kWh
$442
-
kW-mo/yr
- $340 -
TOTAL RECOMMENDED $18,380 $13,599 $9,095
154,161
kWh
$1,371
-
kW-mo/yr
$584
-
MMBtu
$340 $6,990
TOTAL IMPLEMENTED $15,901 $5,706 $7,584
118,991
kWh
$403
-
kW-mo/yr
$584
-
MMBtu
$340 $6,990
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs