| Assessment Year | 2019 |
|---|---|
| Principal Product | Treated Water and Recycled Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 280 |
| Plant Area |
10,500,000
ft2
|
| Annual Production | 11,680,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $315,672 | 1,817,776 |
kWh
|
$0.17 |
| Electricity Demand | $443,554 | 20,784 |
kW-mo/yr
|
$21.34 |
| Natural Gas | $2,008,193 | 420,535 |
MMBtu
|
$4.78 |
| TOTAL YEARLY COSTS | $2,767,419 | |||
| RECOMMENDED SAVINGS* | $287,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $111,927 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $14,931 | $378 |
$14,931
85,976
kWh
|
- | - | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,708 | $260 |
$13,224
76,144
kWh
|
$1,484
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4313: Provide proper maintenance of motor driven equipment | $94,349 | $10,000 |
$84,830
488,455
kWh
|
$9,519
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $5,414 | $648 |
$5,414
31,172
kWh
|
- | - | - | - | |
| 05 | 2.4313: Provide proper maintenance of motor driven equipment | $24,937 | $5,000 |
$22,421
129,099
kWh
|
$2,516
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,025 | $5,039 |
$12,025
69,239
kWh
|
- | - | - | - | |
| 07 | 2.4313: Provide proper maintenance of motor driven equipment | $2,238 | $3,000 | - |
$2,238
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $77,542 | $235,055 |
$61,354
353,280
kWh
|
$8,346
-
kW-mo/yr
|
- | $6,540 | $1,302 | |
| 09 | 2.2126: Lower operating pressure of condenser (steam) | $41,345 | $175,000 |
$47,131
271,385
kWh
|
$5,289
-
kW-mo/yr
|
$(-11,075.0)
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $287,489 | $434,380 |
$261,330
1,504,750
kWh
|
$29,392
-
kW-mo/yr
|
$(-11,075.0)
-
MMBtu
|
$6,540 | $1,302 | ||
| TOTAL IMPLEMENTED | $111,927 | $244,002 |
$92,017
529,835
kWh
|
$12,068
-
kW-mo/yr
|
- | $6,540 | $1,302 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs