ITAC Assessment: SF0537
ITAC logo
ITAC Assessment: SF0537
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Water and Recycled Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 280
Plant Area 10,500,000
ft2
Annual Production 11,680,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,672 1,817,776
kWh
Electricity Demand $443,554 20,784
kW-mo/yr
Natural Gas $2,008,193 420,535
MMBtu
TOTAL YEARLY COSTS $2,767,419
RECOMMENDED SAVINGS* $287,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $14,931 $378 $14,931
85,976
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $14,708 $260 $13,224
76,144
kWh
$1,484
-
kW-mo/yr
- - -
03 2.4313: Provide proper maintenance of motor driven equipment $94,349 $10,000 $84,830
488,455
kWh
$9,519
-
kW-mo/yr
- - -
04 2.4322: Use or replace with energy efficient substitutes $5,414 $648 $5,414
31,172
kWh
- - - -
05 2.4313: Provide proper maintenance of motor driven equipment $24,937 $5,000 $22,421
129,099
kWh
$2,516
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,025 $5,039 $12,025
69,239
kWh
- - - -
07 2.4313: Provide proper maintenance of motor driven equipment $2,238 $3,000 - $2,238
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $77,542 $235,055 $61,354
353,280
kWh
$8,346
-
kW-mo/yr
- $6,540 $1,302
09 2.2126: Lower operating pressure of condenser (steam) $41,345 $175,000 $47,131
271,385
kWh
$5,289
-
kW-mo/yr
$(-11,075.0)
-
MMBtu
- -
TOTAL RECOMMENDED $287,489 $434,380 $261,330
1,504,750
kWh
$29,392
-
kW-mo/yr
$(-11,075.0)
-
MMBtu
$6,540 $1,302
TOTAL IMPLEMENTED $111,927 $244,002 $92,017
529,835
kWh
$12,068
-
kW-mo/yr
- $6,540 $1,302
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs