| Assessment Year | 1999 |
|---|---|
| Principal Product | Roofing shingles |
| NAICS |
n/a
|
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $50 M to 100M |
| # of Employees | 85 |
| Plant Area |
200,000
ft2
|
| Annual Production | 228
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $203,994 | 6,525,498 |
kWh
|
$0.031 |
| Electricity Demand | $53,088 | 13,957 |
kW-mo/yr
|
$3.80 |
| Natural Gas | $663,296 | 165,023 |
MMBtu
|
$4.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,556 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,328 | $4,141 |
$1,854
59,789
kWh
|
$474
-
kW-mo/yr
|
- | - | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $1,140 | $2,650 |
$657
21,102
kWh
|
$483
-
kW-mo/yr
|
- | - | |
| 03 | 2.2136: Install / repair insulation on steam lines | $1,596 | $450 | - | - |
$1,596
-
MMBtu
|
- | |
| 04 | 2.2422: Use waste heat from hot flue gases to generate steam | $12,394 | $42,085 | - | - |
$12,394
-
MMBtu
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,198 | $1,000 | - | - |
$1,198
-
MMBtu
|
- | |
| 06 | 2.2425: Use flue gases to heat process or service water | $62,712 | $2,200 | - | - |
$62,712
-
MMBtu
|
- | |
| 07 | 3.5316: Contract a wood pallet recycling company | $1,200 | - | - | - | - | $1,200 | |
| 08 | 4.652: Replace existing equipment with more suitable substitutes | $1,562 | - |
$1,562
37,222
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $84,130 | $52,526 |
$4,073
118,113
kWh
|
$957
-
kW-mo/yr
|
$77,900
-
MMBtu
|
$1,200 | ||
| TOTAL IMPLEMENTED | $5,556 | $1,450 |
$1,562
37,222
kWh
|
- |
$2,794
-
MMBtu
|
$1,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs