ITAC Assessment: UF0230
ITAC logo
ITAC Assessment: UF0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic drink lids
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 1,640,000,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,446 3,484,760
kWh
Electricity Demand $66,955 7,873
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $15,087 $50 - - $15,087 -
02 2.7135: Install occupancy sensors $1,142 $2,240 $1,142
24,326
kWh
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,804 $8,987 - - - $9,804
04 4.131: Modify process to reduce material use/cost $3,916 - - - - $3,916
05 4.652: Replace existing equipment with more suitable substitutes $198 $280 $54
1,172
kWh
$13
-
kW-mo/yr
- $131
TOTAL RECOMMENDED $30,147 $11,557 $1,196
25,498
kWh
$13
-
kW-mo/yr
$15,087 $13,851
TOTAL IMPLEMENTED $15,087 $50 - - $15,087 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs