ITAC Assessment: UF0226
ITAC logo
ITAC Assessment: UF0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Coated Boxes for Juice
NAICS
n/a
SIC 2656: Sanitary Food Containers, Except Folding
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 310,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 0
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,088 13,974,209
kWh
Electricity Demand $41,731 28,601
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $295,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,552 - $1,552
33,705
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,196 - - $1,196
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $10,378 $50 - - $10,378 - - -
04 2.7135: Install occupancy sensors $1,110 $955 $1,110
24,033
kWh
- - - - -
05 4.711: Initiate a total quality management program $78,207 $22,390 - - - - $78,207
-
lb
-
06 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $200,838 $1,090,000 $359,114
8,353,165
kWh
$8,760
-
kW-mo/yr
$(-18,000.0) $(-149,036.0)
-
MMBtu
- -
07 4.821: Pay bills on time to avoid late fees $1,863 - - - - - - $1,863
TOTAL RECOMMENDED $295,144 $1,113,395 $361,776
8,410,903
kWh
$9,956
-
kW-mo/yr
$(-7,622.0) $(-149,036.0)
-
MMBtu
$78,207
-
lb
$1,863
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs