ITAC Assessment: UF0223
ITAC logo
ITAC Assessment: UF0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Frozen concentrate and single strength orange and grapefruit
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 4,830
Tgal
Production Hrs. Annual 5,040
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,871 2,016,413
kWh
Electricity Demand $23,855 6,024
kW-mo/yr
Fuel Oil #2 $5,184 590
MMBtu
Fuel Oil #6 $122,366 40,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,463 - - $2,463
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $11,615 $50 - - $11,615 -
03 2.7111: Reduce illumination to minimum necessary levels $654 - $434
8,206
kWh
$220
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $2,583 $9,021 $2,065
38,980
kWh
$518
-
kW-mo/yr
- -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $2,250 - - - - $2,250
06 4.652: Replace existing equipment with more suitable substitutes $28,563 $100,600 $17,654
333,236
kWh
$2,409
-
kW-mo/yr
$8,500 -
TOTAL RECOMMENDED $48,128 $109,671 $20,153
380,422
kWh
$5,610
-
kW-mo/yr
$20,115 $2,250
TOTAL IMPLEMENTED $45,665 $109,671 $20,153
380,422
kWh
$3,147
-
kW-mo/yr
$20,115 $2,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs