ITAC Assessment: UF0209
ITAC logo
ITAC Assessment: UF0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Packaging Machinery
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 40,000
ft2
Annual Production 24
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,464 1,094,666
kWh
Electricity Demand $13,598 3,288
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,805 $9,240 $2,003
38,394
kWh
$582
-
kW-mo/yr
- $220
02 2.7232: Replace existing hvac unit with high efficiency model $205 $553 $139
2,638
kWh
$66
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,496 $4,720 $2,646
41,325
kWh
$618
-
kW-mo/yr
- $(-768.0)
04 3.7214: Reduce or eliminate waste $4,654 $6,552 $2,595
49,824
kWh
$619
-
kW-mo/yr
$1,440
-
lb
-
05 4.111: Add equipment/ operators to reduce production bottleneck $9,360 $6,300 - - - $9,360
06 2.8121: Apply for tax-free status for energy purchases $5,907 $50 - - - $5,907
07 4.111: Add equipment/ operators to reduce production bottleneck $2,600 $3,000 - - - $2,600
TOTAL RECOMMENDED $28,027 $30,415 $7,383
132,181
kWh
$1,885
-
kW-mo/yr
$1,440
-
lb
$17,319
TOTAL IMPLEMENTED $2,496 $4,720 $2,646
41,325
kWh
$618
-
kW-mo/yr
- $(-768.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs