ITAC Assessment: UF0207
ITAC logo
ITAC Assessment: UF0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Filtration Systems
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 295,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $683,465 12,509,672
kWh
Electricity Demand $115,909 25,959
kW-mo/yr
Natural Gas $94,065 15,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $5,410 - $5,410
98,476
kWh
- - -
02 2.7132: Install timers on light switches in little used areas $2,168 $648 $2,168
39,566
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,651 $1,688 $3,243
58,910
kWh
$408
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,217 $1,396 $1,020
18,464
kWh
$197
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,914 $1,700 $6,691
121,630
kWh
$2,223
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,587 - $3,587
55,979
kWh
- - -
07 2.7232: Replace existing hvac unit with high efficiency model $2,133 $3,240 $1,434
26,084
kWh
$699
-
kW-mo/yr
- -
08 2.2442: Preheat combustion air with waste heat $14,389 $18,400 - - $14,389
-
MMBtu
-
09 3.6192: Use a less expensive method of waste removal $5,662 - - - - $5,662
10 2.8121: Apply for tax-free status for energy purchases $31,783 $5,000 - - - $31,783
11 4.111: Add equipment/ operators to reduce production bottleneck $4,680 $5,500 - - - $4,680
TOTAL RECOMMENDED $83,594 $37,572 $23,553
419,109
kWh
$3,527
-
kW-mo/yr
$14,389
-
MMBtu
$42,125
TOTAL IMPLEMENTED $55,356 $6,700 $15,688
276,085
kWh
$2,223
-
kW-mo/yr
- $37,445
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs