Assessment Year | 1998 |
---|---|
Principal Product | Filtration Systems |
NAICS |
n/a
|
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
295,000
ft2
|
Annual Production | 250
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $683,465 | 12,509,672 |
kWh
|
$0.055 |
Electricity Demand | $115,909 | 25,959 |
kW-mo/yr
|
$4.47 |
Natural Gas | $94,065 | 15,519 |
MMBtu
|
$6.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,594 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,356 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $5,410 | - |
$5,410
98,476
kWh
|
- | - | - | |
02 | 2.7132: Install timers on light switches in little used areas | $2,168 | $648 |
$2,168
39,566
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,651 | $1,688 |
$3,243
58,910
kWh
|
$408
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,217 | $1,396 |
$1,020
18,464
kWh
|
$197
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,914 | $1,700 |
$6,691
121,630
kWh
|
$2,223
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,587 | - |
$3,587
55,979
kWh
|
- | - | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $2,133 | $3,240 |
$1,434
26,084
kWh
|
$699
-
kW-mo/yr
|
- | - | |
08 | 2.2442: Preheat combustion air with waste heat | $14,389 | $18,400 | - | - |
$14,389
-
MMBtu
|
- | |
09 | 3.6192: Use a less expensive method of waste removal | $5,662 | - | - | - | - | $5,662 | |
10 | 2.8121: Apply for tax-free status for energy purchases | $31,783 | $5,000 | - | - | - | $31,783 | |
11 | 4.111: Add equipment/ operators to reduce production bottleneck | $4,680 | $5,500 | - | - | - | $4,680 | |
TOTAL RECOMMENDED | $83,594 | $37,572 |
$23,553
419,109
kWh
|
$3,527
-
kW-mo/yr
|
$14,389
-
MMBtu
|
$42,125 | ||
TOTAL IMPLEMENTED | $55,356 | $6,700 |
$15,688
276,085
kWh
|
$2,223
-
kW-mo/yr
|
- | $37,445 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs