ITAC Assessment: UF0206
ITAC logo
ITAC Assessment: UF0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated Cardboard Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 240,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 7,904
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,000 6,313,892
kWh
Electricity Demand $104,672 12,729
kW-mo/yr
Natural Gas $194,220 51,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,127 $1,018 $5,703
121,336
kWh
$1,424
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $3,113 $5,880 $3,113
66,237
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,657 $1,657 $1,657
35,170
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $970 - $970
20,516
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,741 $1,160 $1,741
36,928
kWh
- - - -
06 2.2135: Repair and eliminate steam leaks $42,698 $320 - - $42,698
-
MMBtu
- -
07 2.3212: Optimize plant power factor $1,688 $3,000 - - - - $1,688
08 2.6231: Utilize controls to operate equipment only when needed $8,949 $11,900 - $8,949
-
kW-mo/yr
- - -
09 2.6218: Turn off equipment when not in use $4,957 - $4,957
105,510
kWh
- - - -
10 4.711: Initiate a total quality management program $143,200 $22,390 - - - - $143,200
11 3.3111: Adjust ph for neutralization $10,902 $2,410 - - - - $10,902
12 3.5316: Contract a wood pallet recycling company $1,272 - - - - $1,272
-
lb
-
13 2.8121: Apply for tax-free status for energy purchases $2,096 - - - - - $2,096
TOTAL RECOMMENDED $230,370 $49,735 $18,141
385,697
kWh
$10,373
-
kW-mo/yr
$42,698
-
MMBtu
$1,272
-
lb
$157,886
TOTAL IMPLEMENTED $49,648 $7,360 $4,854
103,165
kWh
- $42,698
-
MMBtu
- $2,096
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs