ITAC Assessment: UF0205
ITAC logo
ITAC Assessment: UF0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plywood sheets and treated lumber
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area 200,000
ft2
Annual Production 4,849,998
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,232,166 27,208,676
kWh
Electricity Demand $378,826 50,583
kW-mo/yr
Electricity Fees $(-187,273.0) -
Wood $1,604,952 1,069,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $222,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $189,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $9,940 $10,390 $7,821
173,798
kWh
$2,119
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,997 $3,200 $20,997
411,782
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,422 $1,215 $7,422
165,006
kWh
- - -
04 2.3212: Optimize plant power factor $31,516 $22,000 - - - $31,516
05 2.2136: Install / repair insulation on steam lines $3,075 $471 - - $3,075
-
MMBtu
-
06 2.3212: Optimize plant power factor $13,598 $40,806 $13,598
302,169
kWh
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,914 $10,000 - - - $3,914
08 3.1291: Eliminate practice of mixing waste streams $21,300 $45,000 - - - $21,300
09 4.652: Replace existing equipment with more suitable substitutes $9,360 $10,320 - - - $9,360
10 4.611: Begin a practice of predictive / preventative maintenance $17,160 $10,000 $3,160
69,754
kWh
- - $14,000
11 2.4325: Upgrade conveyors $84,000 $10,500 - - - $84,000
TOTAL RECOMMENDED $222,282 $163,902 $52,998
1,122,509
kWh
$2,119
-
kW-mo/yr
$3,075
-
MMBtu
$164,090
TOTAL IMPLEMENTED $189,646 $107,687 $45,576
957,503
kWh
$2,119
-
kW-mo/yr
$3,075
-
MMBtu
$138,876
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs