Assessment Year | 1998 |
---|---|
Principal Product | Steel Storage Equipment |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 106 |
Plant Area |
112,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,348 | 857,855 |
kWh
|
$0.048 |
Electricity Demand | $36,317 | 3,608 |
kW-mo/yr
|
$10.07 |
Natural Gas | $35,764 | 5,863 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,144 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,497 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,508 | $582 |
$772
17,292
kWh
|
$736
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,287 | $1,200 |
$3,874
86,166
kWh
|
$1,413
-
kW-mo/yr
|
- | - | |
03 | 2.2442: Preheat combustion air with waste heat | $4,304 | $5,200 | - | - |
$4,304
-
MMBtu
|
- | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,194 | $4,200 |
$1,194
26,671
kWh
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,933 | $11,000 | - | - | - | $6,933 | |
06 | 3.8136: Switch to a solvent that can be cleaned and re-used | $14,296 | $1,175 | - | - | - | $14,296 | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,277 | $4,000 | - | - | - | $5,277 | |
08 | 2.8121: Apply for tax-free status for energy purchases | $11,345 | $920 | - | - | - | $11,345 | |
TOTAL RECOMMENDED | $50,144 | $28,277 |
$5,840
130,129
kWh
|
$2,149
-
kW-mo/yr
|
$4,304
-
MMBtu
|
$37,851 | ||
TOTAL IMPLEMENTED | $17,497 | $16,200 |
$3,874
86,166
kWh
|
$1,413
-
kW-mo/yr
|
- | $12,210 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs