ITAC Assessment: UF0203
ITAC logo
ITAC Assessment: UF0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel Storage Equipment
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 106
Plant Area 112,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,348 857,855
kWh
Electricity Demand $36,317 3,608
kW-mo/yr
Natural Gas $35,764 5,863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,508 $582 $772
17,292
kWh
$736
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,287 $1,200 $3,874
86,166
kWh
$1,413
-
kW-mo/yr
- -
03 2.2442: Preheat combustion air with waste heat $4,304 $5,200 - - $4,304
-
MMBtu
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $1,194 $4,200 $1,194
26,671
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,933 $11,000 - - - $6,933
06 3.8136: Switch to a solvent that can be cleaned and re-used $14,296 $1,175 - - - $14,296
07 4.111: Add equipment/ operators to reduce production bottleneck $5,277 $4,000 - - - $5,277
08 2.8121: Apply for tax-free status for energy purchases $11,345 $920 - - - $11,345
TOTAL RECOMMENDED $50,144 $28,277 $5,840
130,129
kWh
$2,149
-
kW-mo/yr
$4,304
-
MMBtu
$37,851
TOTAL IMPLEMENTED $17,497 $16,200 $3,874
86,166
kWh
$1,413
-
kW-mo/yr
- $12,210
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs