Assessment Year | 1998 |
---|---|
Principal Product | Envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 158 |
Plant Area |
124,000
ft2
|
Annual Production | 1,000,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $207,843 | 5,569,754 |
kWh
|
$0.037 |
Electricity Demand | $107,398 | 12,067 |
kW-mo/yr
|
$8.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,332 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,838 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,329 | $9,159 |
$2,160
58,324
kWh
|
$1,169
-
kW-mo/yr
|
- | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $906 | - |
$906
24,619
kWh
|
- | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,351 | $749 |
$1,750
64,478
kWh
|
$601
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,826 | $4,019 |
$1,208
32,532
kWh
|
$618
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,216 | $2,350 |
$8,216
144,197
kWh
|
- | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $359 | $661 |
$145
3,810
kWh
|
$214
-
kW-mo/yr
|
- | - | |
07 | 2.7231: Use radiant heater for spot heating | $18,876 | $14,030 |
$12,906
348,769
kWh
|
$5,970
-
kW-mo/yr
|
- | - | |
08 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,260 | $1,000 | - | - | - | $1,260 | |
09 | 3.7141: Improve cleaning efficiency by maintaining cleaning system | $49,180 | - | - | - |
$49,180
-
lb
|
- | |
10 | 4.322: Eliminate old stock and modify inventory control | $6,029 | $15,000 | - | - | - | $6,029 | |
TOTAL RECOMMENDED | $92,332 | $46,968 |
$27,291
676,729
kWh
|
$8,572
-
kW-mo/yr
|
$49,180
-
lb
|
$7,289 | ||
TOTAL IMPLEMENTED | $62,838 | $7,779 |
$12,225
269,636
kWh
|
$1,433
-
kW-mo/yr
|
$49,180
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |