ITAC Assessment: UF0192
ITAC logo
ITAC Assessment: UF0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fiberglass Boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 208,800
ft2
Annual Production 620
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,828 4,341,149
kWh
Electricity Demand $81,942 11,988
kW-mo/yr
Natural Gas $35,070 4,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,578

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7132: Install timers on light switches in little used areas $1,313 $1,200 $1,313
26,085
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,830 $1,850 $18,830
272,860
kWh
- -
03 2.4133: Use most efficient type of electric motors $626 $844 $443
8,792
kWh
$183
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,669 $3,114 $2,743
54,807
kWh
$926
-
kW-mo/yr
-
05 3.6192: Use a less expensive method of waste removal $36,140 - - - $36,140
06 3.6125: Sell combustible waste $14,456 $1,000 - - $14,456
07 4.111: Add equipment/ operators to reduce production bottleneck $5,200 $2,400 - - $5,200
TOTAL RECOMMENDED $80,234 $10,408 $23,329
362,544
kWh
$1,109
-
kW-mo/yr
$55,796
TOTAL IMPLEMENTED $60,578 $7,008 $23,329
362,544
kWh
$1,109
-
kW-mo/yr
$36,140
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs