Assessment Year | 1998 |
---|---|
Principal Product | Fiberglass Boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
208,800
ft2
|
Annual Production | 620
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,828 | 4,341,149 |
kWh
|
$0.050 |
Electricity Demand | $81,942 | 11,988 |
kW-mo/yr
|
$6.84 |
Natural Gas | $35,070 | 4,987 |
MMBtu
|
$7.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,234 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,578 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7132: Install timers on light switches in little used areas | $1,313 | $1,200 |
$1,313
26,085
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,830 | $1,850 |
$18,830
272,860
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $626 | $844 |
$443
8,792
kWh
|
$183
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,669 | $3,114 |
$2,743
54,807
kWh
|
$926
-
kW-mo/yr
|
- | |
05 | 3.6192: Use a less expensive method of waste removal | $36,140 | - | - | - | $36,140 | |
06 | 3.6125: Sell combustible waste | $14,456 | $1,000 | - | - | $14,456 | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,200 | $2,400 | - | - | $5,200 | |
TOTAL RECOMMENDED | $80,234 | $10,408 |
$23,329
362,544
kWh
|
$1,109
-
kW-mo/yr
|
$55,796 | ||
TOTAL IMPLEMENTED | $60,578 | $7,008 |
$23,329
362,544
kWh
|
$1,109
-
kW-mo/yr
|
$36,140 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs