ITAC Assessment: UF0190
ITAC logo
ITAC Assessment: UF0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 284
Plant Area 67,000
ft2
Annual Production 17,190,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,176 3,603,165
kWh
Electricity Demand $66,385 6,997
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,071

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,094 $45,707 $18,883
385,404
kWh
$3,211
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,253 $1,352 $6,279
128,077
kWh
$974
-
kW-mo/yr
-
03 2.7132: Install timers on light switches in little used areas $7,567 $1,800 $7,567
154,455
kWh
- -
04 2.7135: Install occupancy sensors $10,982 $1,856 $10,982
224,209
kWh
- -
05 2.2515: Use optimum thickness insulation $7,093 $3,500 $7,093
104,338
kWh
- -
06 2.3113: Make ice during off peak hours for cooling $27,537 $59,500 - $27,537
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,664 $1,100 $3,664
53,927
kWh
- -
08 2.4133: Use most efficient type of electric motors $291 $405 $212
4,396
kWh
$79
-
kW-mo/yr
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,235 $11,000 - - $5,235
10 3.5316: Contract a wood pallet recycling company $2,407 - - - $2,407
11 4.126: Install sensors to detect defects $7,272 $2,400 - - $7,272
TOTAL RECOMMENDED $101,395 $128,620 $54,680
1,054,806
kWh
$31,801
-
kW-mo/yr
$14,914
TOTAL IMPLEMENTED $6,071 $1,100 $3,664
53,927
kWh
- $2,407
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs