Assessment Year | 1997 |
---|---|
Principal Product | Livestock & Poultry feed |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
50,000
ft2
|
Annual Production | 115,000
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,152 | 2,194,607 |
kWh
|
$0.044 |
Electricity Demand | $61,814 | 7,895 |
kW-mo/yr
|
$7.83 |
Natural Gas | $41,268 | 10,238 |
MMBtu
|
$4.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,160 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,535 | $3,969 |
$1,031
23,447
kWh
|
$504
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $635 | $640 |
$635
14,361
kWh
|
- | - | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $477 | $133 |
$477
10,844
kWh
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $347 | $347 |
$228
5,275
kWh
|
$119
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,344 | $1,450 |
$6,344
88,218
kWh
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,996 | $1,000 | - | - |
$1,996
-
MMBtu
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $1,445 | $451 | - | - |
$1,445
-
MMBtu
|
- | |
08 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $2,503 | - | - | - | - | $2,503 | |
09 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $4,874 | $4,840 | - | - | - | $4,874 | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $26,752 | $59,000 |
$(-117.0)
2,638
kWh
|
$(-171.0)
-
kW-mo/yr
|
- | $27,040 | |
11 | 4.441: Install automatic packing equipment | $79,467 | $273,000 |
$(-1,258.0)
17,585
kWh
|
$(-395.0)
-
kW-mo/yr
|
- | $81,120 | |
TOTAL RECOMMENDED | $126,375 | $344,830 |
$7,340
162,368
kWh
|
$57
-
kW-mo/yr
|
$3,441
-
MMBtu
|
$115,537 | ||
TOTAL IMPLEMENTED | $18,160 | $11,830 |
$8,715
142,145
kWh
|
$623
-
kW-mo/yr
|
$1,445
-
MMBtu
|
$7,377 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs