ITAC Assessment: UF0188
ITAC logo
ITAC Assessment: UF0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Livestock & Poultry feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 115,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,152 2,194,607
kWh
Electricity Demand $61,814 7,895
kW-mo/yr
Natural Gas $41,268 10,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,535 $3,969 $1,031
23,447
kWh
$504
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $635 $640 $635
14,361
kWh
- - -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $477 $133 $477
10,844
kWh
- - -
04 2.4133: Use most efficient type of electric motors $347 $347 $228
5,275
kWh
$119
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,344 $1,450 $6,344
88,218
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,996 $1,000 - - $1,996
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $1,445 $451 - - $1,445
-
MMBtu
-
08 3.5212: Regrind, reuse, or sell scrap plastic parts $2,503 - - - - $2,503
09 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $4,874 $4,840 - - - $4,874
10 4.111: Add equipment/ operators to reduce production bottleneck $26,752 $59,000 $(-117.0)
2,638
kWh
$(-171.0)
-
kW-mo/yr
- $27,040
11 4.441: Install automatic packing equipment $79,467 $273,000 $(-1,258.0)
17,585
kWh
$(-395.0)
-
kW-mo/yr
- $81,120
TOTAL RECOMMENDED $126,375 $344,830 $7,340
162,368
kWh
$57
-
kW-mo/yr
$3,441
-
MMBtu
$115,537
TOTAL IMPLEMENTED $18,160 $11,830 $8,715
142,145
kWh
$623
-
kW-mo/yr
$1,445
-
MMBtu
$7,377
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs