| Assessment Year | 1997 |
|---|---|
| Principal Product | Magnetic Sensing Equipment |
| NAICS |
n/a
|
| SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 180 |
| Plant Area |
66,000
ft2
|
| Annual Production | 30,500
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,496 | 3,066,823 |
kWh
|
$0.046 |
| Electricity Demand | $51,905 | 6,466 |
kW-mo/yr
|
$8.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,139 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,466 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,486 | $20,719 |
$4,014
87,339
kWh
|
$1,472
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $2,264 | $1,984 |
$2,264
49,238
kWh
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $313 | $133 |
$221
4,689
kWh
|
$92
-
kW-mo/yr
|
- | |
| 04 | 2.2515: Use optimum thickness insulation | $15,189 | $35,749 |
$11,782
256,155
kWh
|
$3,407
-
kW-mo/yr
|
- | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $15,704 | $9,000 | - | - | $15,704 | |
| 06 | 3.8121: Cover containers to minimize evaporative losses | $2,700 | $5,800 | - | - | $2,700 | |
| 07 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,376 | $35,000 | - | - | $5,376 | |
| 08 | 2.8121: Apply for tax-free status for energy purchases | $2,107 | - | - | - | $2,107 | |
| TOTAL RECOMMENDED | $49,139 | $108,385 |
$18,281
397,421
kWh
|
$4,971
-
kW-mo/yr
|
$25,887 | ||
| TOTAL IMPLEMENTED | $20,466 | $43,666 |
$14,267
310,082
kWh
|
$3,499
-
kW-mo/yr
|
$2,700 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs