ITAC Assessment: HO0052
ITAC logo
ITAC Assessment: HO0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Zinc-Die Casting
NAICS
n/a
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $10
M
to 50
M
# of Employees 212
Plant Area 88,000
ft2
Annual Production 168,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,734 3,859,027
kWh
Natural Gas $145,193 32,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $319 $540 $319
3,224
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $872 $3,402 $872
8,499
kWh
-
03 2.4133: Use most efficient type of electric motors $599 $1,517 $599
5,862
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,681 $26,880 $7,681
76,202
kWh
-
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $3,393 $100 $938
9,379
kWh
$2,455
-
MMBtu
06 2.2511: Insulate bare equipment $2,891 $1,300 - $2,891
-
MMBtu
TOTAL RECOMMENDED $15,755 $33,739 $10,409
103,166
kWh
$5,346
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs