ITAC Assessment: UF0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dairy Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 24,000
ft2
Annual Production 104,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,396 4,321,219
kWh
Electricity Demand $38,159 7,998
kW-mo/yr
Natural Gas $59,124 12,517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,485 $2,869 $1,306
25,498
kWh
$179
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,376 $11,050 $2,817
55,100
kWh
$559
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $531 $531 $459
9,086
kWh
$72
-
kW-mo/yr
- -
04 2.2514: Cover open tanks $288 $63 - - $288
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $287 $1,000 - - $287
-
MMBtu
-
06 2.1224: Replace boiler $653 - - - $653
-
MMBtu
-
07 3.1291: Eliminate practice of mixing waste streams $4,567 $2,400 - - - $4,567
08 4.441: Install automatic packing equipment $32,361 $65,000 $(-278.0)
(-5,569)
kWh
$(-121.0)
-
kW-mo/yr
- $32,760
09 4.441: Install automatic packing equipment $33,242 $113,600 $(-849.0)
(-16,706)
kWh
$(-369.0)
-
kW-mo/yr
- $34,460
TOTAL RECOMMENDED $76,790 $196,513 $3,455
67,409
kWh
$320
-
kW-mo/yr
$1,228
-
MMBtu
$71,787
TOTAL IMPLEMENTED $1,471 $1,531 $459
9,086
kWh
$72
-
kW-mo/yr
$940
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs