ITAC Assessment: UF0181
ITAC logo
ITAC Assessment: UF0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 180,000
ft2
Annual Production 480,000
thousand feet
Production Hrs. Annual 5,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,401 3,606,389
kWh
Electricity Demand $87,680 10,143
kW-mo/yr
Natural Gas $261,402 38,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,820 $8,028 $1,752
44,842
kWh
$1,068
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,223 $3,546 $2,378
60,961
kWh
$845
-
kW-mo/yr
- - -
03 2.7145: Install skylights $1,360 $2,650 $1,360
34,877
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $330 $3,111 $192
4,982
kWh
$138
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $5,604 $6,445 - - - - $5,604
06 2.2135: Repair and eliminate steam leaks $7,595 $700 - - $7,595
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,661 $2,000 $2,661
42,204
kWh
- - - -
08 2.8121: Apply for tax-free status for energy purchases $6,843 - - - - - $6,843
09 2.8113: Purchase gas directly from a contract gas supplier $90,777 - - - - - $90,777
10 3.4116: Meter recycled water (to reduce sewer charges) $4,323 $2,500 - - - - $4,323
11 3.5316: Contract a wood pallet recycling company $1,440 - - - - $1,440
-
lb
-
TOTAL RECOMMENDED $126,976 $28,980 $8,343
187,866
kWh
$2,051
-
kW-mo/yr
$7,595
-
MMBtu
$1,440
-
lb
$107,547
TOTAL IMPLEMENTED $111,227 $20,284 $4,605
92,028
kWh
$1,206
-
kW-mo/yr
$7,595
-
MMBtu
$1,440
-
lb
$96,381
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs