ITAC Assessment: UF0178
ITAC logo
ITAC Assessment: UF0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 160,000
ft2
Annual Production 850,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,518 5,403,869
kWh
Electricity Demand $94,194 11,606
kW-mo/yr
Natural Gas $204,758 47,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $339,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $331,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,451 $11,496 $4,126
109,027
kWh
$1,325
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,786 $4,140 $3,702
97,304
kWh
$1,084
-
kW-mo/yr
- - -
03 2.7145: Install skylights $2,447 $3,900 $2,447
64,478
kWh
- - - -
04 2.7132: Install timers on light switches in little used areas $2,305 $1,300 $2,305
60,668
kWh
- - - -
05 2.4133: Use most efficient type of electric motors $427 $3,891 $297
7,913
kWh
$130
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,774 $2,000 $3,774
68,581
kWh
- - - -
07 2.2135: Repair and eliminate steam leaks $1,629 $875 - - $1,629
-
MMBtu
- -
08 2.4239: Eliminate or reduce compressed air usage $12,422 $400 $12,422
225,674
kWh
- - - -
09 3.5316: Contract a wood pallet recycling company $1,500 - - - - $1,500
-
lb
-
10 3.4116: Meter recycled water (to reduce sewer charges) $1,687 $2,500 - - - - $1,687
11 4.111: Add equipment/ operators to reduce production bottleneck $303,534 $400,000 - - - - $303,534
TOTAL RECOMMENDED $339,962 $430,502 $29,073
633,645
kWh
$2,539
-
kW-mo/yr
$1,629
-
MMBtu
$1,500
-
lb
$305,221
TOTAL IMPLEMENTED $331,042 $419,962 $22,924
471,863
kWh
$1,455
-
kW-mo/yr
$1,629
-
MMBtu
$1,500
-
lb
$303,534
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs