| Assessment Year | 1997 |
|---|---|
| Principal Product | Grain and Feed Ingredients |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $50 M to 100M |
| # of Employees | 20 |
| Plant Area |
50,000
ft2
|
| Annual Production | 330,000
ton
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,713 | 654,162 |
kWh
|
$0.044 |
| Electricity Demand | $38,299 | 4,340 |
kW-mo/yr
|
$8.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,656 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,199 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $366 | $1,080 |
$207
4,689
kWh
|
$159
-
kW-mo/yr
|
- | - | |
| 02 | 2.7134: Use photocell controls | $223 | $600 |
$223
4,982
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $692 | $500 |
$692
6,741
kWh
|
- | - | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,726 | - | - |
$5,726
-
kW-mo/yr
|
- | - | |
| 05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $6,707 | $17,000 | - | - | - | $6,707 | |
| 06 | 4.521: Clear and rent existing space | $3,161 | - | - | - | - | $3,161 | |
| 07 | 2.8121: Apply for tax-free status for energy purchases | $2,347 | - | - | - | - | $2,347 | |
| 08 | 3.5316: Contract a wood pallet recycling company | $720 | - | - | - |
$720
-
lb
|
- | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $714 | $500 | - | - | - | $714 | |
| TOTAL RECOMMENDED | $20,656 | $19,680 |
$1,122
16,412
kWh
|
$5,885
-
kW-mo/yr
|
$720
-
lb
|
$12,929 | ||
| TOTAL IMPLEMENTED | $10,199 | $1,000 |
$692
6,741
kWh
|
$5,726
-
kW-mo/yr
|
$720
-
lb
|
$3,061 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs