ITAC Assessment: UF0171
ITAC logo
ITAC Assessment: UF0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Wood Doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 125,000
ft2
Annual Production 550,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,113 1,656,800
kWh
Electricity Demand $25,138 4,449
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,763 $23,909 $5,621
90,563
kWh
$1,142
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $493 $502 $409
6,741
kWh
$84
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,395 $1,350 $6,395
82,943
kWh
- - - -
04 3.2176: Increase use of automation $32,049 - - - - $32,049 -
05 3.5316: Contract a wood pallet recycling company $9,000 - - - $9,000
-
lb
- -
06 3.6192: Use a less expensive method of waste removal $554 - - - - - $554
TOTAL RECOMMENDED $55,254 $25,761 $12,425
180,247
kWh
$1,226
-
kW-mo/yr
$9,000
-
lb
$32,049 $554
TOTAL IMPLEMENTED $16,442 $1,852 $6,804
89,684
kWh
$84
-
kW-mo/yr
$9,000
-
lb
- $554
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs