Assessment Year | 2019 |
---|---|
Principal Product | Metal Beverage Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
350,000
ft2
|
Annual Production | 2,700,000
units
|
Production Hrs. Annual | 8,616
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,068,865 | 46,473,600 |
kWh
|
$0.045 | |
Electricity Demand | $1,655,776 | 69,199 |
kW-mo/yr
|
$23.93 | |
Natural Gas | $766,999 | 192,558 |
MMBtu
|
$3.98 | |
Waste Disposal Costs | |||||
Water Usage | $153,572 | 69,348,156 |
Tgal
|
$0.002 | |
Water Disposal | $547,229 | 69,348 |
Tgal
|
$7.89 | |
TOTAL YEARLY COSTS | $5,192,441 | ||||
RECOMMENDED SAVINGS* | $295,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $220,967 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,837 | $1,500 | - | - | - |
$5,837
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $7,781 | $13,282 | - | - | - |
$7,781
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,524 | $50 |
$7,923
176,057
kWh
|
$601
-
kW-mo/yr
|
- | - | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $15,197 | - | - | - | $15,197 | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $212,444 | $108,320 |
$117,264
2,605,870
kWh
|
$95,179
-
kW-mo/yr
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $45,814 | $7,700 |
$39,420
876,000
kWh
|
$28,716
-
kW-mo/yr
|
- |
$(-22,322.2)
-
MMBtu
|
|
TOTAL RECOMMENDED | $295,596 | $130,852 |
$164,607
3,657,927
kWh
|
$124,497
-
kW-mo/yr
|
$15,197 |
$(-8,704.2)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $220,967 | $108,370 |
$125,187
2,781,927
kWh
|
$95,781
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs