ITAC Assessment: UF0167
ITAC logo
ITAC Assessment: UF0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom printed products
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $50
M
to 100
M
# of Employees 48
Plant Area 47,000
ft2
Annual Production 470,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,349 1,180,246
kWh
Electricity Demand $24,841 2,946
kW-mo/yr
LPG $2,215 112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,171 $7,641 $2,421
53,634
kWh
$750
-
kW-mo/yr
- - - - - -
02 2.7145: Install skylights $682 $480 $682
15,240
kWh
- - - - - - -
03 2.4133: Use most efficient type of electric motors $840 $2,986 $587
13,189
kWh
$253
-
kW-mo/yr
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,043 $750 $1,043
15,826
kWh
- - - - - - -
05 4.511: Expand operations into unused space $3,377 - - - - - $(-5,265.0) $(-4,358.0) - $13,000
06 3.8133: Convert to aqueous cleaning $3,420 - - - - $1,950
-
gal
- - $1,470 -
07 3.3131: Use evaporation to concentrate material $10,122 $4,450 - - $10,122
-
gal
- - - - -
TOTAL RECOMMENDED $22,655 $16,307 $4,733
97,889
kWh
$1,003
-
kW-mo/yr
$10,122
-
gal
$1,950
-
gal
$(-5,265.0) $(-4,358.0) $1,470 $13,000
TOTAL IMPLEMENTED $15,858 $16,307 $4,733
97,889
kWh
$1,003
-
kW-mo/yr
$10,122
-
gal
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs