ITAC Assessment: UF0165
ITAC logo
ITAC Assessment: UF0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Frozen Food
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 180,000
ft2
Annual Production 95,000,000
lb
Production Hrs. Annual 4,030
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,409 24,513,189
kWh
Electricity Demand $398,353 29,464
kW-mo/yr
Natural Gas $211,081 55,951
MMBtu
LPG $27,279 2,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,572 $32,094 $8,734
436,694
kWh
$7,838
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $2,091 $2,802 $950
47,479
kWh
$1,141
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,841 $1,350 $4,841
242,087
kWh
- -
04 2.2615: Clean condenser tubes $19,869 - $19,869
1,569,461
kWh
- -
05 3.1291: Eliminate practice of mixing waste streams $10,500 $400 - - $10,500
-
Tgal
TOTAL RECOMMENDED $53,873 $36,646 $34,394
2,295,721
kWh
$8,979
-
kW-mo/yr
$10,500
-
Tgal
TOTAL IMPLEMENTED $24,710 $1,350 $24,710
1,811,548
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs