ITAC Assessment: UF0158
ITAC logo
ITAC Assessment: UF0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Corrugated Materials
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 300,000
ft2
Annual Production 720,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,830 5,439,625
kWh
Electricity Demand $126,987 15,176
kW-mo/yr
Natural Gas $145,737 57,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,138 $11,595 $2,712
59,203
kWh
$1,426
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,663 $3,726 $1,739
37,808
kWh
$924
-
kW-mo/yr
- -
03 2.7145: Install skylights $2,135 $2,560 $2,135
52,169
kWh
- - -
04 2.7132: Install timers on light switches in little used areas $3,155 $2,220 $3,155
68,875
kWh
- - -
05 2.4133: Use most efficient type of electric motors $4,007 $13,149 $2,622
57,151
kWh
$1,385
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,222 $850 $4,222
60,961
kWh
- - -
07 2.2136: Install / repair insulation on steam lines $1,712 $5,490 - - $1,712
-
MMBtu
-
08 3.4111: Use closed cycle process to minimize waste water production $22,535 $24,000 - - - $22,535
-
Tgal
09 3.4116: Meter recycled water (to reduce sewer charges) $2,074 $2,000 - - - $2,074
-
Tgal
TOTAL RECOMMENDED $46,641 $65,590 $16,585
336,167
kWh
$3,735
-
kW-mo/yr
$1,712
-
MMBtu
$24,609
-
Tgal
TOTAL IMPLEMENTED $32,838 $39,999 $6,844
118,112
kWh
$1,385
-
kW-mo/yr
- $24,609
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs