Assessment Year | 1996 |
---|---|
Principal Product | Bottled Rum |
NAICS |
n/a
|
SIC | 2085: Distilled and Blended Liquors |
Sales Range | $50 M to 100M |
# of Employees | 265 |
Plant Area |
450,000
ft2
|
Annual Production | 5,000,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $244,611 | 6,474,209 |
kWh
|
$0.038 |
Electricity Demand | $131,367 | 15,231 |
kW-mo/yr
|
$8.62 |
Fuel Oil #2 | $39,369 | 5,300 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,798 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,239 | $34,886 |
$9,751
256,741
kWh
|
$5,488
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $830 | $1,749 |
$501
13,189
kWh
|
$329
-
kW-mo/yr
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,031 | $4,640 |
$2,643
69,461
kWh
|
$1,388
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $443 | - |
$443
11,723
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,265 | $1,350 |
$5,265
90,856
kWh
|
- | - | - | |
06 | 2.2425: Use flue gases to heat process or service water | $9,173 | $24,000 | - | - |
$9,173
-
MMBtu
|
- | |
07 | 3.1175: Use a different or recycled raw material | $990 | - | - | - | - |
$990
-
gal
|
|
TOTAL RECOMMENDED | $35,971 | $66,625 |
$18,603
441,970
kWh
|
$7,205
-
kW-mo/yr
|
$9,173
-
MMBtu
|
$990
-
gal
|
||
TOTAL IMPLEMENTED | $26,798 | $42,625 |
$18,603
441,970
kWh
|
$7,205
-
kW-mo/yr
|
- |
$990
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs