ITAC Assessment: UF0153
ITAC logo
ITAC Assessment: UF0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Filter Assemblies
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 140,000
ft2
Annual Production 55,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,598 4,345,252
kWh
Electricity Demand $46,833 10,127
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,550 $25,740 $9,770
184,349
kWh
$1,780
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,689 $6,564 $5,689
107,268
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $27,649 $23,150 $21,767
410,610
kWh
$5,882
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,183 $800 $1,183
18,757
kWh
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $2,640 $4,550 - - $2,640
-
Tgal
TOTAL RECOMMENDED $48,711 $60,804 $38,409
720,984
kWh
$7,662
-
kW-mo/yr
$2,640
-
Tgal
TOTAL IMPLEMENTED $28,832 $23,950 $22,950
429,367
kWh
$5,882
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs