ITAC Assessment: AM0088
ITAC logo
ITAC Assessment: AM0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOLDED RUBBER GASKETS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,895 960,141
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,652 $1,920 $8,652
-
kWh
02 2.4133: Use most efficient type of electric motors $869 $520 $869
14,654
kWh
03 2.4312: Improve lubrication practices $926 - $926
17,878
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $319 $1,530 $319
7,034
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $348 $54 $348
6,448
kWh
06 2.7111: Reduce illumination to minimum necessary levels $305 $165 $305
5,275
kWh
07 2.8123: Pay utility bills on time $123 - $123
-
kWh
TOTAL RECOMMENDED $11,542 $4,189 $11,542
51,289
kWh
TOTAL IMPLEMENTED $123 - $123
-
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs