ITAC Assessment: SD0582
ITAC logo
ITAC Assessment: SD0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 46,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,310
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,012 931,730
kWh
Electricity Demand $170,043 7,506
kW-mo/yr
Electricity Fees $24,146 -
TOTAL YEARLY COSTS $262,201
RECOMMENDED SAVINGS* $34,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $24,520 $35,000 $11,722
160,562
kWh
$12,798
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,455 $8,348 $2,589
35,478
kWh
$2,746
-
kW-mo/yr
$120
03 2.4133: Use most efficient type of electric motors $4,534 $9,736 $2,432
33,314
kWh
$2,102
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $342 $760 $342
4,690
kWh
- -
TOTAL RECOMMENDED $34,851 $53,844 $17,085
234,044
kWh
$17,646
-
kW-mo/yr
$120
TOTAL IMPLEMENTED $34,851 $53,844 $17,085
234,044
kWh
$17,646
-
kW-mo/yr
$120
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs