ITAC Assessment: UF0149
ITAC logo
ITAC Assessment: UF0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pine Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 177,000
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,691 14,127,785
kWh
Electricity Demand $327,906 35,959
kW-mo/yr
LPG $8,805 880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $82,837 - - - $82,837 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,078 $10,028 $2,980
78,546
kWh
$2,098
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $1,923 $4,635 $1,196
31,653
kWh
$727
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,234 $116,200 $35,234
929,660
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,019 $1,350 $8,019
120,750
kWh
- - - -
06 3.6124: Burn waste oil for heat $2,278 - - - - $496
-
MMBtu
$1,782
07 3.1161: Eliminate/reduce an operation $10,016 - - - - - $10,016
TOTAL RECOMMENDED $145,385 $132,213 $47,429
1,160,609
kWh
$2,825
-
kW-mo/yr
$82,837 $496
-
MMBtu
$11,798
TOTAL IMPLEMENTED $60,270 $132,213 $47,429
1,160,609
kWh
$2,825
-
kW-mo/yr
- - $10,016
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs